OUR REFERENCES

Completed airport fuel structures and projects

International Airport Rafic HARIRI of Beirut | lebanon

Diagnosis of hydrant system at Beirut

  • Realisation of hydrant system operative audits at Beirut.
  • The diagnosis studies initially consisted in collecting and analyzing the essential technical data (plans, flow rates, etc.) via a site visit.
  • Presentation of preliminary result on site.
  • All diagnosis studies have been developed on the technical bases of international EI type standards.
  • Preliminary civil-engineering diagnosis.
  • The studies carried out by site made it possible to list, via simple diagrams translating the hydraulic models produced, the possible hydrant system design faults
  • AFDN advised JHF and JIPS on the solutions to adopt based on the specific problems highlighted by the studies
  • All studie was drafted in English

Client

JHF et JIPS

total value

Confidential

Intervention

AFDN carried out one hydrant system operative audits in Lebanon for JHF and JIPS.

International Airport of Mexico | mexico

Creation of international airport Felipe Àngeles (Mexico)

  • Definition and design mission (at the pre-project stage) of the hydrant system and fuel-farm at the new Mexico City international airport on the 3 stages of development until 2052.
  • Information gathering on site.
  • The AIFA’s project represents 29.5 km of pipelines (in 16 inches and less) 350 hydrant pit boxes and 45 low point valve rooms.
  • Realization of the primary location of the hydrant system, pits (depending on the planes of the study) and valve rooms.
  • Carrying out hydraulic simulations to optimize the diameters and route of the jet-fuel networks until the last stage of development in 2052.
  • Preliminary definition of fuel farm pump and pipelines and purges capacity.
  • Definition of materials.
  • Assessment of the savings of the AFDN project compared to the initial project.
  • Study carried out in Spanish.

Client

ESPG

total vALUE

Confidential

Intervention

AFDN carried out the sizing and design of the hydrant system and depot at Felipe Angeles International Airport in Mexico City.

International airport of Ankara, Antalya, Bodrum, Dalaman and Izmir | Turkey

Diagnosis of five hydrant system

  • Realisation of five hydrant system operative audits in Turkey.
  • The diagnosis studies initially consisted in collecting and analyzing the essential technical data (plans, flow rates, etc.) from the different sites.
  • All diagnosis studies have been developed on the technical bases of international EI type standards.
  • The studies carried out by site made it possible to list, via simple diagrams translating the hydraulic models produced, the possible hydrant system design faults.
  • AFDN advised Petrol Ofisi on the solutions to adopt based on the specific problems highlighted by the studies.

  • All studies were drafted in English.

Client

PETROL OFISI

total vALUE

Confidential

Intervention

AFDN carried out five hydrant system operative audits in Turkey for Petrol Ofisi.

La Réunion Roland Garros International Airport | FRANCE

Airport Restructuring And Extension

  • The diagnosis studies initially consisted in collecting and analyzing the essential technical data.
  • Design mission of an aviation fuel hydrant system extension and pit box location. One hydrant system 8” diameter, length about 200 m, 12 hydrant pit boxes and one valve chamber associated to the project – high vent point and low point.
  • Drawing up of details plans and schemes, in accordance with international standards.
  • Advice concerning equipment’s selection.
  • Realization of a planning and a financial estimate of the hydrant system extension project.
  • Drafting of technical market specifications (piping, civil engineering and emergency stop system).
  • Advice on the environmental regulatory part of the extension dossier.

Client

AIA Life Designers

total vALUE

Confidential

Intervention

AFDN was chosen by AIA Life designers to design of the hydrant system for the extension of international Airport of La Réunion

IVATO International airport | MADAGASCAR

Creation of hydrant system for the Tarmac 2 international zone

  • Mission of advisory for the design of an aviation fuel hydrant system extension, feeding Tarmac 2 area (buried loop 8” diameter, length about 600 m for each line pipe, 16 hydrant pit boxes) and the two valves chambers associated to the project – high vent point and low point.
  • Drawing up of details plans and schemes
  • Advice concerning equipments selection (hydrant pits, isolating valves, valve chamber lids, …)
  • Drafting of technical market specifications (piping, civil engineering and emergency stop system)
  • Advice on the choice of contractor to achieve the work
  • Advice on validation of working documents
  • Work follow-up, including remote assistance, and direct field involvement during the most critical phases of work (installation of hydrant pit boxes, connection of the new hydrant system to the existing one and final work pre-reception)

Client

TOTAL Madagasikara

total vALUE

1 900 000 €

Intervention

AFDN supported TOTAL Madagasikara in the development of its main hydrant system at IVATO airport. The mission spanned from the design stage to commissioning.

ROISSY CHARLES DE GAULLE Paris international Airport | France

Replacement of the hydrant system for Terminal 2A Lot 2

  • Management and supervision of the T2A works to replace 20” of the fuel hydrant system (DN 500mm), length approximately 95ml per line, with 5 pits to be created per line and 2 pits to be removed per line. Replacement of the pipes was performed with keeping a line in service for aircraft fuelling
  • Advice on the preparation of site and the supporting method
  • Determination of sequencing of tasks in order to produce a schedule
  • Supervision of civil engineering and pipework (monitoring of works documentation)
  • Monitoring of the progress of works on site and reporting to FCTP (earthworks, monitoring of construction, installation of pipelines and pits)
  • Creation of the final report

Client

FCTP

total VALUE

300 000 €

Intervention

FCTP chose AFDN to provide support in the replacement of the hydrant system for Terminal 2A at Roissy airport. This mission involved consulting and supervision of civil engineering aspects, with a view to ensuring respect of the schedule thereby enabling seamless integration into works being carried out at Paris’s airport.

ROISSY CHARLES DE GAULLE Paris international Airport | France

Creation of hydrant system for Terminal 1 Lot D

  • Management and supervision of works (Lot D) involving the creation of a hydrant system in a service duct (in 8”, length of approximately 45m for each line), and 3 associated chambers (2 concrete manholes and a vent)
  • Determination and sequencing of tasks in order to produce a schedule
  • Supervision of civil engineering work enabling the creation of a service duct (monitoring of civil engineering documentation)
  • Monitoring of the progress of works on site (earthworks, monitoring of construction, installation of pipelines and construction of chambers)
  • Creation of the final report

Client

FCTP

total value

240 000 €

Intervention

These works represented a particularly sensitive phase in the modifications to the hydrant system, because they were very close to an airport terminal used for the transit of passengers for Roissy CDG Terminal 1.  AFDN advised FCTP and its subcontractors in the execution of the works through to commissioning.

ROISSY CHARLES DE GAULLE Paris international Airport | France

Creation of a hydrant system for Terminal 1 Lots A & B

  • Management and supervision of works (Lots A and B) creation of a hydrant systems (in 16”, length of approximately 260 ml for each line and 6 pits per line), and a vent chamber.
  • Advice on site preparation
  • Determination and sequencing of tasks in order to produce a schedule
  • Supervision of civil engineering and pipework (monitoring of works documentation)
  • Monitoring of the progress of works on site and reporting to FCTP (earthworks, monitoring of construction, installation of pipelines and pits, construction of the chamber)
  • Advice on the compilation of the test report as required by the French regulations
  • Creation of the completion of the final report

Client

FCTP

total value

940 000 €

Intervention

These works represented the second phase of the changes to the hydrant system, in accordance with the transformation of Terminal 1 at Roissy CDG. AFDN advised FCTP and its subcontractors in the execution of the works through to commissioning.

ROISSY CHARLES DE GAULLE Paris international Airport | France

Creation of hydrant systems for Terminal 1 Lot F

  • Management and supervision of works (Lot F) creating hydrant systems (in 16”, length of approximately 50ml for each line and 2 pits per line), and a low point chamber to be constructed on the existing pipelines.
  • Advice on site preparation
  • Determination and sequencing of tasks in order to produce a schedule
  • Supervision of civil engineering works (monitoring of works documentation)
  • Monitoring of the progress of works on site, reporting to ETC International (earthworks, monitoring of construction, construction of the chamber and installation of pits)

Client

ETC International

total value

1 100 000 €

Intervention

AFDN advised ETC International in the monitoring and coordination of works through to commissioning and connection of the hydrant systems from previous phases to the existing.

Paris-ORLY AIRPORT | France

Creation of hydrant systems for Golf aircraft parking area

  • Management and supervision of works (lot 1A and 1B) and creation of hydrant systems (buried circuit in 12”, length of approximately 150 m for each pipeline, 22 pits), and one chamber with associated valves (low point)
  • Determination and sequencing of tasks in order to produce a schedule
  • Advice and supervision of civil engineering work enabling the creation of the low point chamber
  • Monitoring of the progress of works on site, reporting to ETC International (earthworks, installation of pipelines, filling and compacting trials, construction of the valve chamber)

Client

ETC International

total value

650 000 €

Intervention

Orly airport is undergoing a reborn, with the hydrant system being extended and modified accordingly. AFDN advised ETC International on the monitoring of the works and was responsible for the entire coordination of the extension site.

ROISSY CHARLES DE GAULLE Paris international Airport | France

Creation of hydrant systems for Terminal 1 Lot C

  • Management and supervision of works (lot C) and creation of hydrant systems (buried circuit in 8”, length of approximately 70 m for each pipeline), and one chamber with associated valves (low point)
  • Determination and sequencing of tasks in order to produce a schedule
  • Supervision of civil engineering work enabling the creation of the low point chamber
  • Monitoring of the progress of works on site, reporting to FCTP (earthworks, installation of pipelines filling and compacting trials, construction of the valve chamber)

Client

FCTP

total value

500 000 €

Intervention

These works represented the first phase of the modification of the hydrant system for Terminal 1 at Roissy CDG. FCTP chose AFDN for the coordination and supervision of the civil engineering works.